Project Description

Synthetic turf covering over an existing damaged sub-base for a football pitch at Petroleum Development of Oman NIMR

Client

Petroleum Development of Oman

Location

Nimr

Year

2019-2020

Contractor

Carillion Alawi LLC

Synthetic turf covering over an existing damaged sub-base for a football pitch at PDO NIMR

OVERVIEW
The client wanted to cover an existing football field with synthetic football turf. The sub-base below was damaged and they wanted a solution without replacing the sub-base.

SOLUTION
The Khimji Ramdas Sports & Fitness team proposed a 10mm thick rubber shock pad be laid below the Football Turf, which increased the cushioning of the entire system and also eliminated the need to lay a new sub-base.

RESULT
The new design was cost effective and provided additional cushioning for the safety of players.

CONCLUSION
Our team proved their ability to tailoring a cost-effective solution that also enhanced safety.